CFR-WB3™

CFR-WB3-20L

Downloads and Related Information

High performance, water-based concrete form release agent and bold breaker.

Aluminium and steel concrete form release for complex moulds and large diameter spun pipes (1m plus).

 

Product Technical Benefits

  • Clean release characteristics, low dusting.
  • Water based emulsion – contains no solvents or hydrocarbons.
  • Safe and non-hazardous to personnel.
  • Designed for use with steel, aluminium and film faced wood forms/ moulds.

 

Product Applications

  • Tilt slabs.
  • Complex/intricate moulds.
  • Large diameter pipes, bigger than 50cm diameter.
  • Also acts as slab-on-slab bond breaker.

 

How to Use

MOULD PREPARATION
1)  Ensure the mould is thoroughly clean before using CFR-WB3™:

a)  Scrub the mould using a degreaser / solvent / purposed made cleaner, with a brush / non-scratch scrubbing pad, then polish off all residue with absorbent cloths before it dries.
b)  Repeat as necessary until mould is thoroughly clean and allow to dry fully.

2)  Conditioning clean mould: Depending on the grade, finish and condition of the mould / form it might be necessary to apply a precoat of CFR-WB3™ and allow it to dry, then apply a second coat as the mould release agent. This is only for the first pour.

3)  Cleaning the mould between pours: After each pour thoroughly remove all dry concrete residue / dust using brushes, cloths etc, paying attention to corners, nooks and crannies, before CFR-WB3™ is applied for the next pour.

HOW TO APPLY

1)  Apply CFR-WB3™ with an airless sprayer, which achieves a fine mist and allows even coating of the surface.
2)  Ensure all of the mould / form surfaces are covered with an even, thin coating of CFR- WB3™.
3)  Be careful to avoid concentration or pooling of the product or drips. On vertical surfaces do not over-apply – so you avoid the product running or dripping.
4)  After application allow the product to dry fully. Drying time depends on ambient temperature and humidity. Once a clear film is left on the mould, the mould is ready for concrete.
5)  NOTE – It is highly recommended to experiment with mould surface preparation, spray application and drying time to achieve the best result before tackling a large project.
6) NOTE – It is highly recommended that application method, drying time and mould surface preparation be thoroughly examined to determine the applicable production parameters – i.e. experiment to achieve the best result before tackling a large project.

 

Pack Sizes

  • 20L (5.3GAL); 200L (53GAL)

 

Accidents

Spillage – Take up mechanically or with absorbent material such as sand, earth or vermiculite.

 

Transport

TDG UN Status: This material is not regulated hazardous material for transportation.

 

Shelf Life and Storage Guidelines

Shelf life is 4 months from the date of delivery.
Storage temperature should be within the range of 5 to 32°C (40-90°F) Containers should be well sealed.

 

Technical Data

  • Specific Gravity: ~1.0
  • Colour: Milky white to yellowish
  • Weight: 20L (5.3G) = 20.5Kg (45Lb), 200L (53G) = 215Kg (474Lb).
  • VOCs: Zero

 

Country of Manufacture

Australia