C-COMPLEX™ – RUNWAY – SLAB REMOVAL

Melbourne, Australia – August 2021

Case Study Details

Download full case study here

C-Complex-Melbourne-Airport-August-2021

PROJECT : MELBOURNE AIRPORT CUTTING CONCRETE SLABS

PLACE : Melbourne Airport

DATE : 24th August 2021

CONTRACTOR : Prouts Tiling and Concrete & Asphalt Cutting

CONTACT DETAILS : Brett Prout

TELEPHONE : 0430 477 662

FACEBOOK : Click Here

SUPPLIER : Smart Diamond Tools

EMAIL : sales@smarttools.com.au

WEB : www.smarttools.com.au

PROJECT REQUIREMENTS :

1) Increase cutting speed on Road Saw

2) Assist with slurry control

3) Reduce water consumption

4) Increase tool life

CHEMFORCE SOLUTION :

The 62 Core Cut road saw (C805 Blade – Smart Diamond Tools) water feed was directly dosed with 1% C-Complex

1)  118 Lineal meters @ 430mm depth

2)  Completed in 57 minutes – Prouts reported that it would normally have taken 2-3 hours, on this site.

3)  Slurry run off was kept close to the job and was easily vacuumed up.

4) Minimal wear was noticed on the blade